SD-274
[slopodar-spa-checklist] SPA restructure testing checklist prepared. 7-item live testing protocol for slopodar v0.3.0 SPA navigation support. Uncommitted content.js in worktree at /home/mrkai/code/tspit-iife-for-life — syntax passes (node -c), commit pending Captain’s say-so. Deferred items: About tab copy (Captain has a lot on his plate), PoA Phase 1a/1b (Captain defers).
Active — awaiting Captain live test
← all decisions